Uncategorized

Recent Posts

CT DOT to Hold Virtual Public Update on Bridge Replacement at Hillside and Putnam

The change in vertical alignment will require approximately 850-feet of roadway reconstruction along US Route 1, which includes reconstruction of the Hillside Road intersection with US Route 1.
Approximately 200-feet of Hillside Road will need to be reconstructed as well. A stone arch dike located approximately 300-feet downstream of the subject bridge will be removed as part of this project in order to improve the hydraulics of the proposed bridge. Continue Reading →

Filed under:

OBERLANDER: Bike Planning Study is a Valuable Conservation Commission Project

“Unfortunately, over 100 individual residents supporting the study wasn’t enough to clear the hurdle imposed by First Selectman Camillo when he deleted this valuable Conservation Commission project from his proposed budget due to competing demands, such as decorative barriers on Greenwich Avenue and a re-design of Roger Sherman Baldwin Park.” – Jill Oberlander Continue Reading →

Filed under: , , ,